Project Name- Senatech

This pre-engineered industrial building (PEB) for a multinational client with clean room, offices, and production areas required a comprehensive approach that balances functionality, efficiency, and regulatory compliance. Here are the key steps involved in designing:

Site Evaluation and Planning: Developed the site plan that optimizes space allocation, facilitates efficient material flow, and ensures compliance with local regulations and environmental considerations.

• Clean Room Design: Collaborated with clean room specialists and adhere to industry standards (such as ISO classifications) to design and construct clean room areas with the required cleanliness levels.

Production Area Layout: Optimized the production area layout to streamline material flow, enhance operational efficiency, and accommodate production machinery and equipment.

Structural Design and Engineering: Collaborated with the structural engineers and PEB specialists to design a structurally sound building that meets the client's requirements for load-bearing capacity, span, and height restrictions.

Mechanical, Electrical, and Plumbing (MEP) Systems: Ensured compliance with relevant industry standards and regulations to maintain operational efficiency and occupant comfort.

Safety and Security: Integrated robust safety features such as fire detection and suppression systems, emergency exits, and adequate lighting throughout the facility.

Sustainability and Energy Efficiency: Incorporated sustainable design practices and energy-efficient technologies, such as solar panels, energy-efficient insulation, natural lighting solutions, and water conservation measures.

Compliance and Permitting: Ensured compliance with local building codes, safety regulations, environmental standards, and clean room guidelines.

Site : Greater NOIDA
Area : 8,000 sqm
Built-up Area : 7,000 sqm
Year : 2021 - completed
Project : Industrial Building